The Engineering Department manages the overall administration of capital improvement projects to ensure adherence to all City, State, and Federal Regulations pertaining to the development of contracts for professional services and construction projects. The City Engineer is responsible for securing and administering local, state and federal grants and loans for capital improvement projects.
Current projects out to bid may be viewed at www.AAplanroom.com
As of March 01, 2019, The City of Massillon Engineer’s Office will utilize AA Blueprint to store and distribute specifications and other contract documents. Project documents are on file for purchase either electronically anytime, or by mail or in person from 8:00 AM to 5:00 PM, Monday through Thursday at:
AA Blueprint
2757 Gilchrist Road
Akron, Ohio 44305
www.AABlueprint.com
voice: 800-821-3700
The only bids that will be accepted will be those of bidders of record. Bidders of record are those who have signed the bidders list, obtained specifications and paid the prescribed fee. Upon payment for each set, plus tax, shipping and handling. The fee is non-refundable.
Current Engineering Projects:
02/11/2019: 2019 SR172- 6.44 Lincoln Way Streetscape PID #104857 Project-
Statement of Qaulifications-Construction Inspection and Construction Administration services
AWARD: JMT, Inc., Cleveland, Ohio
5/2/2019: 2019 SR172- 6.44 Lincoln Way Streetscape PID #104857 Project Re-Bid – Bid Results
AWARD: Central Allied Enterprises, Canton, Ohio
08/21/2020: 2020 Renaissance of Duncan Plaza– Bid Results
AWARD: R.G. Smith, Canton, Ohio
10/28/2020: 2020 St Andrews Estates Roadway Improvement Project Phase II – Bid Results
AWARD: Wenger Excavating, Dalton, Ohio
10/28/2020: Springhill Settlement Drainage Improvement Project Phase III – Bid Results
AWARD: Wenger Excavating, Dalton, Ohio
11/10/2020: Hills and Dales Storm Sewer Rehabilitation
AWARD: Wenger Excavating, Dalton, Ohio
12/03/2020: 2020 Richville Nave Intersection Signalization Project – Bid Results
AWARD: Greenwich Electric, Medina, Ohio
03/03/2021: 2021 Erie Street Underpass Rehabilitation Project – Bid Results
AWARD:
Forecasted Engineering Projects:
2021 Street Resurfacing Project –
AWARD: 4/20/2021
2021 Target Area Streets Resurfacing Project
AWARD: 4/6/2021
2021 City Street Crack Sealing Program
AWARD: 4/20/2021
2021 MRF Erie Street South Resurfacing Project
AWARD: 4/6/2021
2021 Catch Basin Replacement Project I
AWARD: 4/6/2021
2021 Catch Basin Replacement Project II
AWARD: 4/6/2021
2021 St. Andrews Estates Phase III Improvement Project
AWARD: 6/22/2021
2021 Castle West Estates Phase I Imporvement Project
AWARD: 4/6/2021
Current Wastewater/Stormwater Projects:
Current Other Projects
12/03/2020: Recreation Center Aquatics Rehabilitation Design/Build
1/14/2021: Legends of Massillon Turf Mower Lease Program – Bid Results
Forecasted Other Projects: