919 Sidewalk, Curb, Driveway Approach Replacement Program

****UPDATED****
5/2/2024

This program IS NOW CLOSED for 2024.

APPLICATIONS ARE ACCEPTED UNTIL APRIL 30 of each program year, depending on the remaining allocated funds available.

CONTRACTORS MUST BE LICENSED for the calendar year BEFORE APPLICATIONS will be APPROVED.
REMIND your CONTRACTOR to RENEW, OBTAIN, and MAINTAIN their CONCRETE LICENSE every calendar year.

APPLICATIONS ARE NOW CLOSED

CHECK BACK IN LATE DECEMBER 2024/JANUARY 2025 FOR MORE INFORMATION

Program Background

The City of Massillon, through the Office of the Director of Public Safety and Service, is hereby authorized to assist private property owners in the replacement of existing sidewalk, curb, combined curb and gutter, or a driveway approach in accordance with the procedures set forth in Chapter 919 of the Codified Ordinances. The purpose of this Chapter shall be to encourage private property owners located in the City of Massillon to replace deteriorating sidewalk, curb, combined curb and gutter, or driveway approach in both residential and non‐residential districts; the program shall be limited to sidewalk, curb, combined curb and gutter, or driveway approach replacement projects which comply with the criteria set forth in Chapter 919, coinciding with Chapter 905 of the Codified Ordinances, and conforming to the standards specifications of Chapter 917 of the Codified Ordinances of the City of Massillon.

APPLICATION INFORMATION PACKET

APPLICATION - NOW ACCEPTING APPLICATIONS!!! Make certain your Concrete Contractor is LICENSED for 2024.

919 Codified Ordinance – Sidewalk and Curb Replacement Program

905 Codified Ordinance – Sidewalks and Curbs

917 Codified Ordinance – Standards for Curbs, Sidewalks, Driveways

CURRENT LIST OF LICENSED CONCRETE CONTRACTORS for 2024

QUESTIONS?

If you have any questions, please contact the Massillon Engineering Department at (330) 830-1722.